Sunday, November 29, 2009

To-do List and Check Out Our Updated Schedule (Applied on to Our Old Schedule)

1. Cut out all remaining parts (Base, walls, and axles of cart)
2. Press fit all bearings, wheels, and axles together *Make sure to consult Bob about fits
3. Assemble all parts together (Walls to base, axles to base, and MCM to axles)
4. Re-adjust our gear ratio to allow for the wedge to drop faster behind the balls
5. Apply some soft material to the edges of our wedge and arm to make sure it doesn't harm the arena. Also, apply material to wheels to allow them to grip the arena better.
6. Make sure that when all components are assembled, they will fit the volume constraints
7. Test out how the motors work with the axles and the wedge
8. Hook up control box and make sure we know how to manuver all of our parts
9. Do test runs to make sure that there isnt any thing else needed
10. MAKE VIDEO
11. dont have a panic attack, jk :)

No comments:

Post a Comment